Mozel Chemical Process Facility

Owner Model Chemical, Inc.
Design Build Mechanical icon Mechanical
Value of icon's Work $1,100,000

icon Mechanical served as the Design/Build Mechanical Contractor and Commissioning Manager for this $15 million chemical blending facility. The 190,000 square foot facility has many process mixing, blending, batching, and storage areas.

icon Mechanical was responsible for the complete design/build construction effort for the process and utility applications, including managing the process controls and electrical design. We started this project with a verbal specification. The owner was currently closing an existing facility. Their existing facility was a 50-year-old process that was in need of significant improvements. Together with the owner we developed a strategy for getting the existing plant closed and relocating its equipment into the new facility. We designed and implemented a new process that would be more reliable, efficient, safe, and cost effective.

icon’s Design/Build team developed process and instrumentation diagrams (P&ID’s). From these documents we ordered all long lead items (equipment, piping specialties, instrument). Then we detailed and developed our mechanical design, general arrangements, piping layouts and isometrics.

Responsibilities

  • Design/Build Contractor
  • Utility Systems
  • Instrument air systems
  • Nitrogen systems
  • Hot Water System

DeProcess Systems

  • Solvent Storage & Mixing
  • Resin Storage & Mixing
  • Minor additions Storage & Mixing
  • Hazardous Area installations (explosion proof equipment, working in exp. area…)

Commissioning Manager

  • Solvent Storage & Mixing
  • Resin Storage & Mixing
  • Minor additions Storage & Mixing
  • Hazardous Area installations
  • Instrument air systems
  • Nitrogen systems
  • Hot Water System