Ameren River Intake Pump Replacement
Owner | Ameren UE |
---|---|
Construction Manager | MC Industrial |
Design Build Mechanical | icon Mechanical |
Value of icon's Work | $250,000 |
Icon Mechanical served as the Mechanical Contractor for this outage project at Ameren-Sioux location. This project consisted of:
- Relocation of Emergency Seal Water piping
- icon Job Specific Quality Control Program Design and implementation including certified welding program.
- Critical lift & Lug design and execution of the removal of (2) Separate River intake pumps and installation of (2) river intake pumps.
Amongst other continued projects at this location, icon Mechanical was able to complete this outage project on time with 0 injuries.
Site Safety
AWS-CWI Certification
Critical Lift design & Execution for (2) River Intake pumps.
Small bore fabrication, installation and testing.
Quality and Safety Program design and implementation.