Memorial Hospital East

Owner Memorial Group, Inc.
Architect HDR
Construction Manager Holland/Pepper
Design Build Mechanical icon Mechanical
Value of icon's Work $13,936,000

Responsibility

Provide revised design to meet budget.

  • 94 Bed Hospital
  • Medical/surgical
  • Obstetrics
  • Intensive care units
  • Cardiac catheterization lab
  • Emergency room and surgical suites

Design Assist Contractor:

  • HVAC Systems
  • 1,000 tons operating 500 ton standby
  • (7) AHUs
  • (343) VAV with hot water coils
  • (3) Gas fired boilers
  • (578) Med Gas outlets
  • (12) OR booms
  • RO /DI piping
  • Fuel oil piping