St. Elizabeth Hospital

Owner Hospital 'Sisters Health System
Architect Kahler Slater
Construction Manager Alberici / Holland
Design Build Mechanical icon Mechanical
Value of icon's Work $23,279,000

Responsibility: Design Assist and Installation on Mechanical Systems

  • 144 Bed Hospital
  • Medical/surgical
  • Obstetrics
  • Intensive care units
  • Cardiac catheterization lab
  • Emergency room and surgical suites
  • Imaging Suites

 

Design Assist Contractor:

  • HVAC Systems
  • (3) 1100 ton chillers
  • (7) Custom AHUs
  • General and ISO Exhaust Systems
  • (35) FCU’s and Unit Heaters
  • (709) VAV with hot water coils
  • (2) Gas Fired Steam Boilers
  • (5) Hot water condensing boilers
  • (28) OR booms
  • Medical gas equipment and piping
  • RO /DI piping

Capabilities Used