Wastewater Treatment Plant Upgrade, Conoco Phillips

Roxana, IL
Owner Conoco Phillips
Construction Manager Flour
Design Build Mechanical icon Mechanical
Value of icon's Work 8,000,000

icon Mechanical served as the Mechanical Contractor for this wastewater treatment plant upgrade. Icon was selected as part of the construction team based on previous refinery experience, cost opinion submittal and successful performance on previous demanding industrial projects.

icon Mechanical worked closely with the owner, engineers, general contractor and other subcontractors to perform this project while maintaining the operation of the existing facilities. The challenges on this project included restricted work areas, remote lay-down areas, remote office and craft facilities, an operating plant environment, hazardous work areas, stringent quality program, a construction start prior to the completion of engineering, and an aggressive EPA mandated completion date.

Responsibilities

Equipment Setting

  • (4) 500 HP blowers
  • Chemical pumps
  • Floating aerators
  • Clarifiers
  • Tanks

Piping Systems

  • Storm sewer
  • Process sewer
  • Fire protection
  • Compressed air
  • Steam
  • Utility water
  • Influent process stream
  • Effluent
  • Oxidation air
  • Chemical additives

Piping Materials

  • Stainless steel
  • Fiberglass
  • Concrete pipe
  • PVC
  • Galvanized
  • Carbon Steel