Boeing – MQ-25 Stingray Facility
Extensive mechanical scope for Boeing's 291,000-square-foot Mascoutah facility that will produce the MQ-25 Stingray, the Navy's first carrier-based unmanned aircraft.
icon Mechanical is serving as design-assist mechanical and plumbing contractor for Boeing's 3A Brownleigh expansion near St. Louis Lambert Airport, one of the most significant aerospace manufacturing investments in the region. The program spans 158 acres and roughly two million square feet across multiple buildings, nearly doubling Boeing's military aircraft manufacturing footprint in the St. Louis area and establishing what will be among the most advanced digital aerospace design and manufacturing environments in the world.
icon is executing the work as a joint mechanical build with Murphy Company, delivering a multi-trade scope across the assembly building and Central Utility Plant. Modularized pipe assemblies ranging from 1/8" to 42" diameter have streamlined installation, while design-assist efforts have optimized the CUP mechanical layout for the end user.
Extensive mechanical scope for Boeing's 291,000-square-foot Mascoutah facility that will produce the MQ-25 Stingray, the Navy's first carrier-based unmanned aircraft.
Commissioning manager and design/build mechanical contractor for a $14 million upgrade of GlaxoSmithKline's Tums plant, which makes 100% of the world's Tums.
Mechanical contractor for Nashville Yards Towers Two and Three, 64 combined stories and over 1.3 million square feet, providing design-assist HVAC and plumbing.
Design-assist mechanical and plumbing for Albion in the Gulch, a 415-unit, 20-story high-end residential development in Nashville's Gulch neighborhood.
icon Mechanical served as general contractor for an $18.7 million process systems upgrade at GKN Hoeganaes' active powder metallurgy manufacturing facility in Gallatin, Tennessee.
icon Mechanical delivered design-assist HVAC and plumbing for American Foods Group's 800,000 SF beef processing facility.