Hoeganaes Powder Metallurgy Facility Upgrade
icon Mechanical served as general contractor for an $18.7 million process systems upgrade at GKN Hoeganaes' active powder metallurgy manufacturing facility in Gallatin, Tennessee.
Manufacturing environments depend on mechanical systems that can perform under demanding operating conditions. From production floors to utility infrastructure, every system must support efficiency, uptime, safety, and adaptability.
icon partners with owners, engineers, and construction managers to deliver mechanical solutions for facilities where schedule, coordination, and operational continuity are critical.
Mechanical systems designed to support high-performance production environments and evolving process needs.
Large-scale mechanical solutions for multi-building facilities, expansions, and phased operations.
Our teams combine engineering, fabrication, and field execution to deliver coordinated systems that support manufacturing performance.
icon Mechanical served as general contractor for an $18.7 million process systems upgrade at GKN Hoeganaes' active powder metallurgy manufacturing facility in Gallatin, Tennessee.
icon Mechanical is the mechanical contractor of choice for Diageo's Captain Morgan Distillery in St. Croix, delivering complex mechanical scopes across multiple engagements at the iconic facility.
icon Mechanical is delivering the full mechanical scope for a confidential Fortune 500 client's $500 million plant expansion in Ohio.
icon Mechanical is delivering design-assist mechanical and plumbing for Boeing's landmark 3A Brownleigh expansion near St. Louis Lambert Airport.
icon Mechanical served as the piping and sheet metal subcontractor for the Paint Shop Nov. 2019 – Jan. 2020 Shutdown.
icon Mechanical served as the design/build mechanical and plumbing contractor for this LEED Platinum project. This project consisted of new office and conference spaces, a new vivarium building, renovated offices, renovation of existing lab space, and creation of three new labs in the existing building.
Installation of a 50MW Combustion Gas Turbine on this $25 million power generation project. icon was presented with the task of installing the underground utilities during the winter months followed by the installation of critical piping systems on the turbine-generator.
Relocation of Emergency Seal Water piping. icon Job Specific Quality Control Program Design and implementation including certified welding program. Critical lift & Lug design and execution of the removal of (2) Separate River intake pumps and installation of (2) river intake pumps.