Built ahead for a better build Modular Construction

Mechanical Systems Planned For the Way Projects Get Built

Modular construction is most effective when it is considered early. icon works with project teams to identify opportunities for off-site assembly, coordinate details before they reach the field, and deliver mechanical systems that are built around real installation conditions. We can even start with a simple idea and bring it to reality.

From fabrication planning through final set, our teams connect engineering, shop, and field expertise to reduce friction and improve the build experience. With extensive experience collaborating during early design, we help identify opportunities to transform projects into repeatable modular skid solutions that improve efficiency, enhance quality, and increase safety throughout construction.

Modular solutions, Racks, & Skid assemblies

Shop-built piping, supports, and skid systems planned for quality, access, and field-ready installation. Remove man-hours off site, increase quality and safety, and to provide certainty of outcome.

Converted-42

Central Utility Infrastructure

Large-scale mechanical systems assembled to support demanding loads, campus infrastructure, and long-term performance.

IMG 0221

Integrated Delivery From Planning Through Installation

Our teams combine preconstruction planning, engineering coordination, fabrication, modular assembly, and field execution to support mechanical systems that are easier to install and built for long-term performance.

  • Early modular planning and constructability review
  • Engineering and fabrication coordination
  • Shop-built mechanical assemblies
  • Quality checks before systems reach the field
  • Just-in-time delivery and installation support

Modular in Motion

Hear from icon team members on how modular construction connects early planning, shop-built precision, safer execution, and field-ready installation to create a smoother, more predictable build.

Built to Reduce Field Risk

By moving more work into controlled shop environments, icon helps reduce field congestion, improve access, and support safer installation once assemblies arrive on site.

Our Modular Construction Experience

See All Projects

Hoeganaes Powder Metallurgy Facility Upgrade

Hoeganaes Powder Metallurgy Facility Upgrade

icon Mechanical served as general contractor for an $18.7 million process systems upgrade at GKN Hoeganaes' active powder metallurgy manufacturing facility in Gallatin, Tennessee.

American Food Groups - Beef Processing Facility

American Food Groups - Beef Processing Facility

icon Mechanical delivered design-assist HVAC and plumbing for American Foods Group's 800,000 SF beef processing facility.

Confidential Advanced Energy Manufacturing Facility

Confidential Advanced Energy Manufacturing Facility

icon Mechanical delivered design-build mechanical systems for a confidential advanced power transformer manufacturing facility in the Southeast, including prefabricated process piping racks supporting advanced production and assembly operations.

Confidential Data Center (3 Buildings / 68 MW)

Confidential Data Center (3 Buildings / 68 MW)

icon Mechanical is delivering mechanical scope for three 68MW, 236,000 SF hyperscale data centers on the campus of a confidential client. Scope for each building includes liquid cooling, 26 massive air handlers, and a redeployable modular equipment platform.

Bayer Crop Science's Research Campus

Bayer Crop Science's Research Campus

icon Mechanical served as general contractor for an infrastructure upgrade and installation of 31 controlled environment growth chambers at Bayer Crop Science's Chesterfield, Missouri campus.

BJC HealthCare Campus Renewal - Patient Room Pods & Headwalls

BJC HealthCare Campus Renewal - Patient Room Pods & Headwalls

icon Mechanical executed its largest prefabricated pod and headwall program to date for BJC HealthCare's 660,000 SF Campus Renewal Phase III hospital expansion in St. Louis.

Siteman Cancer Center

Siteman Cancer Center

icon Mechanical designed, prefabricated, and installed HVAC systems for Siteman Cancer Center's nine-story, 659,000 SF outpatient facility for Washington University School of Medicine.

Confidential Data Center (2 Buildings / 300 MW)

Confidential Data Center (2 Buildings / 300 MW)

icon Mechanical is delivering mechanical and HVAC scope for two 300 MW enterprise hyperscale data center buildings on a 1,400-acre campus in the Southwest.

Let’s Talk About Your Next Project

Connect With Us

Industrial Team Collaboration