Confidential Cathode Manufacturing Plant
icon Mechanical delivered piping, ductwork, and high-hazard dust collection for this cathode production facility, one of the largest industrial projects in the region.
icon Mechanical served as the Engineer of Record for the mechanical systems supporting Air Products' 75,000-square-foot manufacturing expansion in St. Louis, Missouri. The design-build project included engineering, BIM/VDC coordination, in-house fabrication, and installation of critical process piping and HVAC systems. A primary challenge involved developing a reliable piping infrastructure capable of transporting high-purity gases while preventing absorption, leakage, and potential safety hazards. icon's engineering team developed a polypropylene piping solution selected for its resistance to chemical corrosion and gas absorption.
icon Mechanical delivered piping, ductwork, and high-hazard dust collection for this cathode production facility, one of the largest industrial projects in the region.
Mechanical contractor for the $84 million, LEED Gold Wexford Heritage renovation, over 190,000 square feet of multi-tenant lab and research space, with HVAC and chillers.
Mechanical contractor for a five-story, 606-bed Washington University residence hall with a 50,000-square-foot dining facility, fan coil units, and steam boilers.
Design-assist HVAC contractor for a new 144-bed HSHS replacement hospital in O'Fallon, IL, providing value engineering and leading BIM coordination across trades.
Design/build mechanical and plumbing contractor for Solae's LEED Silver, 170,000-square-foot headquarters, installing HVAC and lab utility systems for research areas.
Mechanical contractor for Pfizer's $200 million, 294,000-square-foot R&D and laboratory facility, home to vaccine and biotherapeutic development, with clean rooms.