BJC Healthcare (Phase III) – Patient Tower & Penthouse
Mechanical design-assist partner for BJC's Phase III Campus Renewal, a 617,000-square-foot, 17-story patient tower, prefabricating and installing its HVAC systems.
icon Mechanical was initially engaged to review the project design and recommend ways to reduce overall cost through a value-alternate design exercise and ultimately became an integral member of the BIM design team.
icon fully modeled and coordinated all HVAC piping, ductwork, and medical gas services with the other trades, then used robotic layout to install hangers and seismic anchors ahead of the concrete pour. The result: design-assist and installation of the complete mechanical systems for this 144-bed acute-care hospital.
HVAC Systems
Medical & Specialty Piping
Mechanical design-assist partner for BJC's Phase III Campus Renewal, a 617,000-square-foot, 17-story patient tower, prefabricating and installing its HVAC systems.
Design-assist mechanical contractor for the BJH North Penthouse, a two-story turnkey addition built atop a new twelve-story hospital as a prefabricated penthouse.
icon Mechanical installed mechanical systems for Washington University School of Medicine's LEED Silver certified, six-story, 181,000 SF Couch Biomedical Research Building, achieving significant cost savings through value engineering.
icon mechanical served as the mechanical contractor for the buildout of the 12th and 14th floors at Vanderbilt Children's Hospital. Upon completion, the medical center will feature a footprint of more than 1,000,000 square feet and a total capacity of 401 patient beds.
icon Mechanical served as the Design/Build Mechanical Contractor for this LEED Platinum project. This project consisted of a new office space, dedicated computer room, UPS room, and receiving warehouse.
Mechanical contractor for the $84 million, LEED Gold Wexford Heritage renovation, over 190,000 square feet of multi-tenant lab and research space, with HVAC and chillers.