Confidential Cathode Manufacturing Plant Clarksville, TN

Owner
Confidential
Value
$260,000,000
Construction Manager
JE Dunn
Industries
Emerging Technology
Manufacturing
icon's role
Design-Build
Fabrication & Modular
Mechanical Construction
HVAC & Sheet Metal
Plumbing

icon Mechanical served as the mechanical contractor for this $3.2 billion, a five-story, 800,000 SF building, built for a confidential international client. Leveraging deep knowledge of local and national codes, progressive engineering, and modularization, icon delivered a fast-paced, build-to-suit solution for the Fortune Global 500 client. 

Scope of Work
  • Piping — 108,000 LF total installed
    • 86,000 LF stainless steel pipe and tubing, ¼" tubing to 36" diameter (Sch. 10)
    • Majority passivated and cleaned for oxygen service
  • Ductwork — 2.2 million lbs. total installed
    • 50% stainless steel / 50% galvanized
  • High-hazard dust collection
Peak Craft
  • 370 total craft
  • 160 pipefitters
  • 180 sheet metal
  • 30 plumbers
Project Insights
  • $3.2B project value · 800,000 SF · 160 ft tall · 20-month duration
  • 108,000 LF piping · 2.2M lbs. ductwork installed
  • Supplied 80 pipefitters to adjacent Hankook project at peak

Tell Us About Your Project

Let's Get Started