Confidential Data Center (2 Buildings / 70 MW) Midwest

Owner
Confidential
Value
$90,000,000+
Construction Manager
Gray Construction
Industries
Data Centers
Emerging Technology
icon's role
Design-Assist
Fabrication & Modular
Mechanical Construction
HVAC & Sheet Metal
Plumbing

icon Mechanical delivered the mechanical and plumbing scope across this confidential colocation data center campus, spanning multiple buildings totaling 70+ MW and 800,000+ SF. From the outset, icon brought constructability and BIM expertise to the table, providing full BIM support for the mechanical and plumbing systems and coordinating closely with the other trades to resolve clashes before they reached the field.

icon's preconstruction input drove the work toward off-site modular construction, and its value-added ideas improved system efficiency, constructability, and project economics while compressing the schedule.

Scope of Work

Mechanical

  • Installation of owner-provided precision cooling equipment
  • Mechanical systems including CRAH/CRAC units, air-cooled chillers, computer distribution units, RTUs, humidifiers, fans, split systems, and air-cooled condensing units
  • Distribution systems, chilled water and refrigerant piping, and insulation
  • Ductwork distribution
  • Heat trace and leak detection subcontracting
  • Generator exhaust installation and belly tank testing

Plumbing

  • Underground and overhead domestic water, sanitary, and storm systems
  • Overhead domestic water, sanitary, and storm systems
  • Key subcontractor management including excavation and insulation
Project Insights
  • 70+ MW across the colocation campus
  • 800,000+ SF, two floors per building
  • Precision computer room units providing 13,000 tons of cooling
  • Refrigerant piping optimized for modular off-site fabrication
  • Multiple supplemental systems: split systems, packaged units, and ventilation

Tell Us About Your Project