Confidential Data Center (3 Buildings / 68 MW) Southeast

Owner
Confidential
Value
$216,000,000
Construction Manager
Walbridge
Industries
Data Centers
Emerging Technology
icon's role
Fabrication & Modular
Mechanical Construction
HVAC & Sheet Metal

icon Mechanical is delivering the mechanical scope for three 68MW, 236,000 SF hyperscale data centers on the campus of confidential client. The project scope spans liquid cooling, large-scale air handling, refrigeration, ductwork, plumbing, and fuel oil systems, all supported by an aggressive off-site modular fabrication strategy.

A defining feature of icon's approach is the design and fabrication of a modular 36' x 50' x 32' equipment platform engineered to be disassembled and redeployed to identical buildings on the campus. 

Scope of Work
  • Liquid cooling — approximately 10,000 LF of tubing
  • Assembly and setting of 26 air handlers, approximately 100,000 lbs each
  • Refrigeration systems
  • Ductwork
  • Above and below ground plumbing
  • Fuel oil system
  • Off-site fabrication: mechanical room skid, air handler piping drops, modular equipment platform
Project Insights
  • Three buildings
  • 68MW · 236,000 SF · Two floors per building
  • 26 air handlers at approximately 100,000 lbs each
  • 10,000 LF of liquid cooling tubing
  • Modular 36' x 50' x 32' equipment platform designed for redeployment across campus buildings
  • Currently in progress