icon Mechanical is delivering design-assist mechanical and plumbing for Boeing's landmark 3A Brownleigh expansion near St. Louis Lambert Airport.
An existing 70-year-old, 5-story manufacturing plant in the heart of Downtown St. Louis was the setting of this highly complicated building upgrade. The $14 million upgrade of GlaxoSmithKline’s Tums manufacturing center modernized many of its existing systems. Complicating the project was the fact that this facility manufactures 100% of the Tums in the world, meaning it operates 24 hours a day during the week and 12 hours per day on weekends.
This facility’s manufacturing processes and schedules required the new systems to come online quickly and work with precision. Therefore, icon Mechanical served as commissioning manager and design/build mechanical contractor. During the project, icon’s meticulous and detailed commissioning management program ensured that the systems would come online and function as designed.
icon was responsible for designing, installing and commissioning a 200-ton chilled water system, and a fully redundant pumping system to safeguard from disruptions that may interfere with production. In addition, icon installed a vacuum transfer system to pull the granule formula throughout the lines, in lieu of the existing pneumatic push system that blew granule throughout the plant.
icon also retrofitted three product silos and installed five new ones. The most complicated challenge was removing the roof to install the fourth-floor silos. Since this was an existing building, there were no large openings to utilize while bringing in mechanical components.
HVAC Systems
Process Systems
icon Mechanical is delivering design-assist mechanical and plumbing for Boeing's landmark 3A Brownleigh expansion near St. Louis Lambert Airport.
icon Mechanical delivered piping, ductwork, and high-hazard dust collection for this cathode production facility, one of the largest industrial projects in the region.
Design/build mechanical and plumbing contractor for Solae's LEED Silver, 170,000-square-foot headquarters, installing HVAC and lab utility systems for research areas.
Mechanical contractor for Pfizer's $200 million, 294,000-square-foot R&D and laboratory facility, home to vaccine and biotherapeutic development, with clean rooms.
Mechanical contractor for 16,000 square feet of controlled-environment growth rooms at the Monsanto (now Bayer) campus, installing chilled water, RO water, and lab waste.
Design/build mechanical contractor for a Kraft Foods/Capri Sun expansion, prefabricating overhead piping to keep production running while adding a new assembly line.