Solae Global Headquarters
Design/build mechanical and plumbing contractor for Solae's LEED Silver, 170,000-square-foot headquarters, installing HVAC and lab utility systems for research areas.
icon Mechanical served as the mechanical contractor for 16,000 SF of plant growth rooms on the Monsanto (now Bayer) campus in Chesterfield, MO, delivering the project across two phases—first the utility infrastructure, then the growth-chamber systems. icon completed the work on time and to the owner's full satisfaction.
Phase 1 — Utilities
Phase 2 — Growth-Chamber Infrastructure
Design/build mechanical and plumbing contractor for Solae's LEED Silver, 170,000-square-foot headquarters, installing HVAC and lab utility systems for research areas.
icon Mechanical delivered design-build mechanical, plumbing, and piping systems for a Biosafety Level 3 laboratory fit-out for a confidential client. The space includes specialized biowaste decontamination and 2,400 LF of welded stainless steel ductwork.
icon Mechanical is delivering design-assist mechanical and plumbing for Boeing's landmark 3A Brownleigh expansion near St. Louis Lambert Airport.
icon Mechanical served as the design/build mechanical contractor for this 165,000 square foot LEED Certified laboratory facility.
Commissioning manager and design/build mechanical contractor for a $14 million upgrade of GlaxoSmithKline's Tums plant, which makes 100% of the world's Tums.
Mechanical contractor for Pfizer's $200 million, 294,000-square-foot R&D and laboratory facility, home to vaccine and biotherapeutic development, with clean rooms.