Confidential Data Center (36 MW) Midwest

Owner
Confidential
Value
$42,000,000+
Construction Manager
Gray Construction
Industries
Data Centers
Industrial
icon's role
Engineering
Fabrication & Modular
Mechanical Construction
HVAC & Sheet Metal
Plumbing

icon Mechanical delivered the mechanical and plumbing scope for this 36 MW colocation data center, built for a confidential hyperscale client. From the outset, icon brought constructability and BIM expertise to the table, providing full BIM support for the mechanical and plumbing systems and coordinating closely with the other trades to resolve clashes before they reached the field.

icon's preconstruction input drove the project toward off-site modular construction, and its value-added ideas improved system efficiency, constructability, and project economics for this 446,000 SF data center while compressing the schedule.

Scope of Work

Mechanical

  • Installation of owner-provided precision cooling equipment
  • Mechanical system including: CRAH units,  air-cooled chillers, computer distribution units, RTUs, humidifiers, fans, and split systems
  • All distribution systems, chilled water piping, insulation, etc.
  • Ductwork distribution
  • Heat trace and leak detection subcontracting

Plumbing

  • Underground domestic, sanitary, and storm systems
  • Overhead domestic water, sanitary, and storm systems
  • Manage key subcontractors including excavation and insulation
Project Insights
  • 36 MW
  • 446,000 SF encompassing two floors
  • 112 Precision computer room air-handling units, 96 CDU units, and 28 air-cooled chillers providing 13,000 tons of cooling
  • Over 50,000 LF of chilled water piping  ideal for modular, off-site construction
  • Multiple, additional systems to support data areas including split systems, packaged units, ventilation systems, etc.
  • Generator exhaust installation and belly tank testing