Blue Origin Engine Facility
Mechanical engineer and contractor for Blue Origin's 400,000-square-foot facility manufacturing the BE-4 next-generation liquid-fuel rocket engine, with heavy automation.
As the design-assist partner engineer, icon Mechanical delivered the mechanical scope on the core and shell of this 20-story, 566,000 SF Class A office tower—Amazon's Operations Center of Excellence—and its adjacent 600,000 SF parking garage in downtown Nashville, TN.
icon prefabricated to the maximum extent possible, the key to keeping this fast-track project on pace. Working a parallel construction path, icon's installation team set equipment and components on the night shift while the building was still being erected, compressing the schedule by building up and out at the same time.
Mechanical — Delivery & Install
icon Prefabrication (Granite City, IL — HQ Shop)
Mechanical engineer and contractor for Blue Origin's 400,000-square-foot facility manufacturing the BE-4 next-generation liquid-fuel rocket engine, with heavy automation.
Mechanical contractor for Nashville Yards Towers Two and Three, 64 combined stories and over 1.3 million square feet, providing design-assist HVAC and plumbing.
Design-assist mechanical and plumbing for Albion in the Gulch, a 415-unit, 20-story high-end residential development in Nashville's Gulch neighborhood.
icon Mechanical is delivering design-assist mechanical and plumbing for Boeing's landmark 3A Brownleigh expansion near St. Louis Lambert Airport.
Design/build mechanical contractor for Zurich's 783,800-square-foot headquarters, once the largest LEED Platinum building in North America, with magnetic-bearing chillers.
Design-assist HVAC contractor for a new 144-bed HSHS replacement hospital in O'Fallon, IL, providing value engineering and leading BIM coordination across trades.