US Steel – Granite City Works
Mechanical contractor for industrial mechanical work at US Steel's Granite City Works in Southwestern Illinois, completed within nine months with zero injuries on site.
icon Mechanical served as the mechanical contractor for this new, $290,000,000 facility, assuming responsibility for piping and equipment setting. The new plant’s 120 heat recovery ovens have the capacity to produce 650,000 tons of screened blast furnace coke from bituminous coal annually using a very clean process.
icon provided mechanical construction services for the process and distribution systems and was responsible for the recovery and transfer of the gas to the cogeneration plant. Project leaders kept the massive project on schedule, closely coordinating the work of up to 90 icon pipe fitters and millwrights with up to 900 construction workers overall.
Mechanical contractor for industrial mechanical work at US Steel's Granite City Works in Southwestern Illinois, completed within nine months with zero injuries on site.
Mechanical contractor for the Karn Unit 1 gland steam and turbine retrofit, relying on extensive pre-job planning and shop fabrication to deliver the outage.
Installation of a 50MW Combustion Gas Turbine on this $25 million power generation project. icon was presented with the task of installing the underground utilities during the winter months followed by the installation of critical piping systems on the turbine-generator.
Coordinated with ALSTOM Power on the Unit 1 and 2 turbine retrofit for Alabama Power, completing both outages several shifts early across 15,000 craft hours injury-free.
Delivering mechanical systems for the $2.64 billion, 2.8-million-square-foot Ultium Cells EV battery plant in Spring Hill, TN, a GM and LG Energy joint venture.
Design/build mechanical contractor delivering utility services across a half-million-square-foot Nissan facility, with over 40,000 feet of modularized pipe on 54 racks.