Suncoke & Gateway Energy | New Coke Plant
Mechanical subcontractor for SunCoke and Gateway Energy's $290 million coke plant serving US Steel, with 120 heat-recovery ovens and steam systems.
icon Mechanical served as the mechanical contractor for this U.S. Steel plant in Southwestern Illinois, executing large-bore process piping and supporting HVAC inside a fully operational facility. The centerpiece was the installation of 96"-diameter piping—set in 40' to 80' sections and guided by a critical lift plan covering 14 individual sections. Working amid live plant operations and alongside icon's other ongoing projects at the location, the team completed the project in 9 months with zero injuries.
Large-Bore Process Piping
HVAC & Natural Gas
Testing, Quality & Safety
Mechanical subcontractor for SunCoke and Gateway Energy's $290 million coke plant serving US Steel, with 120 heat-recovery ovens and steam systems.
Delivering mechanical systems for the $2.64 billion, 2.8-million-square-foot Ultium Cells EV battery plant in Spring Hill, TN, a GM and LG Energy joint venture.
Design/build mechanical contractor delivering utility services across a half-million-square-foot Nissan facility, with over 40,000 feet of modularized pipe on 54 racks.
Design/build mechanical for a fast-track office and 200,000-square-foot pharmaceutical production facility built in 82 days, with 27 rooftop units set by helicopter.
Mechanical contractor for a de-sulfurization project at US Steel's Granite City plant in Southwestern Illinois, completed on time in 13 months with zero injuries.
Mechanical systems for a 9,600-square-foot data center using a hot-aisle/cold-aisle design, with eight AHUs and four 200-ton air-cooled chillers on variable drives.