Confidential Data Center (12.5 MW)
Mechanical design-assist on a Tier III data center expansion, scaling a 185,000 sq ft Southeast facility to 12.5MW.
icon Mechanical served as the design-build mechanical contractor on this four-story data center, converting a historic department store into a modern, Tier III-rated facility. To meet the project's mechanical support demands, icon engineered a customized two-pump system backed by two standby pumps.
Air-Side Distribution (9,600 SF Data Hall — Hot Aisle / Cold Aisle)
Chilled-Water Plant (Roof)
Reliability & Controls
Mechanical design-assist on a Tier III data center expansion, scaling a 185,000 sq ft Southeast facility to 12.5MW.
Mechanical contractor for industrial mechanical work at US Steel's Granite City Works in Southwestern Illinois, completed within nine months with zero injuries on site.
Delivering mechanical systems for the $2.64 billion, 2.8-million-square-foot Ultium Cells EV battery plant in Spring Hill, TN, a GM and LG Energy joint venture.
Mechanical subcontractor for SunCoke and Gateway Energy's $290 million coke plant serving US Steel, with 120 heat-recovery ovens and steam systems.
Design/build mechanical contractor delivering utility services across a half-million-square-foot Nissan facility, with over 40,000 feet of modularized pipe on 54 racks.
Design/build mechanical for a fast-track office and 200,000-square-foot pharmaceutical production facility built in 82 days, with 27 rooftop units set by helicopter.