Express Scripts Innovation & Technology Center St. Louis, MO

Owner
Express Scripts
Value
$2,500,000
Construction Manager
Clayco/PARIC JV
Architect
Forum Studio
LEED
Certified
Industries
Commercial
Industrial
Institutional
LEED / Green Building
icon's role
Engineering
Fabrication & Modular
Mechanical Construction
HVAC & Sheet Metal

icon Mechanical served as the design-build mechanical contractor for this fast-track office and pharmaceutical production facility, built from the ground up in just 82 days. The LEED-certified complex pairs a 30,000 SF, two-story office with a 200,000 SF production facility housing the High-Volume Filler (HVF) pharmacy automation system. To hold the aggressive schedule, icon set all 27 rooftop units on the roof in under 45 minutes using a helicopter, then installed the compressed air, piping, and HVAC systems that bring the HVF online.

Scope of Work
  • HVAC systems
  • HVF particulate-removal HVAC, designed and installed by icon to stratify and remove airborne particulate generated during pharmaceutical bottling
  • Compressed air & process piping
LEED Certification — icon Contributions
  • Assisted Fundamental & Enhanced Commissioning (Cx)
  • Fundamental & Enhanced Refrigerant Management
  • Measurement & Verification (M&V) Plan
  • IAQ Performance · Construction IAQ Management
  • Outdoor Air Monitoring · Increased Venti
  • Thermal Comfort Design · Indoor Pollutant Source Control
Project Insights
  • 82-day ground-up construction (fast-tracked)
  • 27 RTUs / 920 tons set by helicopter in under 45 minutes
  • 650 SCFM compressed air system