US Steel – Granite City Works
Mechanical contractor for industrial mechanical work at US Steel's Granite City Works in Southwestern Illinois, completed within nine months with zero injuries on site.
icon Mechanical has built a strong track record at ConocoPhillips' refinery operations through a series of demanding industrial projects, each requiring precision execution in active, highly regulated plant environments.
icon served as mechanical contractor for a major wastewater treatment plant upgrade, selected based on prior refinery experience and a proven performance record on complex industrial projects. The work was performed while maintaining full operation of the existing facility under an EPA-mandated completion date. Challenges included restricted and hazardous work areas, remote lay-down and craft facilities, a stringent quality program, and a construction start ahead of completed engineering.
Scope of Work
Equipment setting: four 500 HP blowers, chemical pumps, floating aerators, clarifiers, and tanks
icon executed the replacement of C5/C6 tank transfer connections at the Hartford facility, including safety reviews, inlet flange monitoring, and pump realignment.
icon managed the receiving, offloading, and erection of two large-diameter process towers:
Mechanical contractor for industrial mechanical work at US Steel's Granite City Works in Southwestern Illinois, completed within nine months with zero injuries on site.
Mechanical subcontractor for SunCoke and Gateway Energy's $290 million coke plant serving US Steel, with 120 heat-recovery ovens and steam systems.
Mechanical contractor for a de-sulfurization project at US Steel's Granite City plant in Southwestern Illinois, completed on time in 13 months with zero injuries.
icon delivered the mechanical and plumbing scope for this 446,000 SF, 36 MW data center, built for a confidential hyperscale client.
icon Mechanical is delivering design-assist mechanical and plumbing for Boeing's landmark 3A Brownleigh expansion near St. Louis Lambert Airport.
Installation of a 50MW Combustion Gas Turbine on this $25 million power generation project. icon was presented with the task of installing the underground utilities during the winter months followed by the installation of critical piping systems on the turbine-generator.