Facility Expansion, Kraft Foods / Capri Sun
Design/build mechanical contractor for a Kraft Foods/Capri Sun expansion, prefabricating overhead piping to keep production running while adding a new assembly line.
A surge in demand for White Claw hard seltzer put the owner in immediate need of new capacity, and the answer was a one-million-square-foot, $400 million grass-roots brewery, fast-tracked for a six-month completion in early 2021. The general contractor engaged icon Mechanical for the facility's MEP system design and components, including the central utility plant (CUP).
icon began fabricating CUP components just 15 days after award, then shipped them to the site timed to arrive exactly when needed. icon delivered on schedule, clearing the way for the brewery to open inside its six-month window.
Central Utility Plant — Chilled Water
Steam & Process Hot Water
Compressed Air
Day 1: Project Awarded
Day 15: Equipment released, VDC proceeding, then modularization
Day 90: CUP ready on site
Day 180: Start-up
Design/build mechanical contractor for a Kraft Foods/Capri Sun expansion, prefabricating overhead piping to keep production running while adding a new assembly line.
Design/build mechanical contractor for a 146,000-square-foot office and beer warehouse, the country's first geothermal beer warehouse, with a lake-source HVAC system.
Design/build mechanical contractor for Zurich's 783,800-square-foot headquarters, once the largest LEED Platinum building in North America, with magnetic-bearing chillers.
Design/build mechanical and plumbing contractor for Solae's LEED Silver, 170,000-square-foot headquarters, installing HVAC and lab utility systems for research areas.
Mechanical contractor for Pfizer's $200 million, 294,000-square-foot R&D and laboratory facility, home to vaccine and biotherapeutic development, with clean rooms.
Design/build mechanical for a fast-track office and 200,000-square-foot pharmaceutical production facility built in 82 days, with 27 rooftop units set by helicopter.